Sl. No | Scope of Work | Client | Technology |
1 | Operation of incinerator inside carriage Repair Workshop | East Coast Railway
|
Air diffusion |
2 | Operation of oil fired incinerator ,capacity 50 kg/Hr for disposal of waste FRP,PlY,etc generated during POH at CRW/Mancheswar | East Coast Railway
|
Incineration |
3 | Operation and Preventive Maintenance of ETP for Sea Food Processing Unit at Botanda | Magnum Sea foods Pvt. Ltd.
|
Anaerobic & Air diffusion |
4 | Operation & Maintenance of ETP for treatment of plant effluents. | Hindalco Industries Ltd. | Air diffusion & Filtration |
5 | Annual Operation and maintenance of 5 KLPD Effluent Treatment Plant | Arya Iron & Steel Company Pvt. Ltd. | Chemical treatment & Filtration |
6 | Operation & Maintenance of ETP for treatment of plant effluents. | Hindalco Industries Ltd. | Chemical treatment & Filtration |
7 | Operation and Maintenance of sewage treatment plant Deojhar. | Jindal Steel & Power Ltd | UASB |
8 | Effective Treatment Of Effluent Generated From Coal Chemicals Department In Biological Oxidation And Dephenolization (Bod) | Steel Authority of India Limited. | Chemical treatment & Surface Aeration |
9 | Annual Operation and maintenance of EffluentTreatment Plant
|
Indian Metals & Ferro Alloys Ltd. | Chemical treatment & Filtration |
10 | Recycling of filter Backwash water of Rolling Mill Pump House on Divisible Turnkey Contract Basis.
|
Steel Authority of India Ltd. | Chemical treatment & Settling |
11 | Maintenance of STP and Supply of Materials. | Hindustan Coca-Cola Beverages Pvt. Ltd. | FAB |
12 | Operation & Maintenance of ETP at Omfed Balasore Dairy
|
Omfed Balasore Dairy | Surface Aeration |
14 | Modification/ Improvement Of our existing ETP -300LKD
|
Teekay Marines Pvt. Ltd | FAB |
16 | Operation and preventive maintenance of colony STP-500KLD.
|
Bhushan Steel Limited | FAB |
17 | Operation and maintenance of 50 KLD sewage treatment plant located at Porta Hurt in our Mines. | Sarda Mines Private Limited | Anaerobic |